Bridge GU57, Grafton Regis
This project entailed the installation of cast in-situ concrete piles though bridge abutments, installation of mini piles and construction of pile caps to stabilise the south west wingwall, brickwork repairs (above and below water level – canal dewatered locally using portadams to facilitate below water repairs), road resurfacing and white lining to bridge.
The programme was completed 2 weeks ahead of programme.
Client: British Waterways
Value: £190,000
Location: Grafton Regis
<<< Back
